18 Jan 03 (1.5 Hours)
Finished welding the transmission tunnel. Also welded the rear
shock absorber top plates.
20 Jan 03 (1 hour)
Using a 15mm plumber's spring and my workbench I bent the bottom corners in
to shape (and almost succeeded in knackering the ends of my workbench).
21 Jan 03 (45 minutes)
Using a plumber's spring again, managed to bend the rear end in to shape (The
picture shows an earlier attempt - the bends aren't right and the length is too
long)
31 Jan 03 (2 hours 30 minutes)
Cut the curved rear end to size. Welded in place. Cut and welded the 22 mm
rear corner supports. (I think these are welded to far out at the bottom, in the
book they show them welded next to the curved corner pieces). Also cut
and welded the 19mm round rear support tubes, (in the middle and the corners.)
|