http://www.bargains/ |
5 April 03 (2 Hours)Managed to borrow a spare Mig (thanks Euan) Spent a lot bit of time fully welding all the joints on the chassis. 6 April 03 (1 Hour)More joint welding. 12 April 03 (20 minutes)Spent 20 minutes grinding some of the joints down in order to fit the floor. 13 April 03 (1.5 Hours)Welded the floor in place. This had been supplied & cut on a guillotine by Euan - thanks again. 14 April 03 (2 Hours)Made a jig out of MDF to position the front suspension wishbones. This was constructed by following Dougie Well's design that is available at this link to the Yahoo Locost site mirror 20 April 03 (All day)Didn't get chance to work on the car - my wife decided it was
time to do the garden in time for summer! We moved in last year and the previous
owners had built a lot of walls that broke up the garden too much. They had also
laid a lot of stones over plastic and this is causing very bad drainage
problems. 21 April 03 (3 hours)More gardening with Graham. 26 April 03 (3 hours)Yet more gardening! (by my self this time). Managed to remove all the unwanted walls, slabs and stones. Started shift the levels. I now need to get a rotavator on it, add some extra top soil and lay the turf.
|